What is Fssd SCDF?
The Fire Safety and Shelter Department (FSSD) is a subdivision of the Singapore Civil Defence Force (SCDF). The office maintains and enforces the fire safety and CD shelter standards which secures the safety of the homes and workplaces in Singapore.
What is Fssd submission?
Fire Safety SG provides FSSD Submission of Fire Safety Plan for businesses or for anyone who has proposed fire safety works. Singapore Civil Defence Force (SCDF) sets, maintains and enforce a high standard of fire safety to ensure a safe and secure work place in Singapore.
Who can submit plans to Fssd for approval?
Prior to going through the application process, you must seek a Qualified Person (QP) to assist. Based on the requirements set by the FSSD, only QPs are allowed to submit the application for plan approval. Before submitting anything, you must thoroughly review every plan, design, and document with your QP.
What does Fssd mean?
FSSD
Acronym | Definition |
---|---|
FSSD | Fire Safety and Shelter Department (Singapore) |
FSSD | Finance Systems Support & Development (UK) |
FSSD | Fort Smith School District (Arkansas) |
FSSD | Foreign Service Selection Date |
What is SCDF Noa?
SCDF/FSSD will process all the submitted documents and issue a “Notice of Approval” (NOA) with the necessary Reference Number.
What is notice of approval SCDF?
Any person who wishes to commence or carry out any proposed fire safety works in any building shall apply in accordance with the Regulations made under the Fire Safety Act to SCDF for approval of the plans of the fire safety works.
What is FSSB Singapore?
For any premise/ shop before it can be safely occupied/ operate as business, the owner of the premise/ shop need to apply to Fire Safety and Shelter Bureau (FSSD) for an approved Building Plan with all the necessary firefighting provision depending on the usage/ class of the premise.
What is MAA submission Singapore?
Minor Addition/Alteration Works.
How do I become a QP in Singapore?
A QP is a person who is:
- Registered as an Architect with the Board of Architects (BOA) or a Professional Engineer with the Professional Engineers Board (PEB)
- Has a valid practising certificate issued by the BOA or PEB.
How is occupancy load calculated in SCDF?
Office occupancy (Staircase S1) Number of persons per unit of exit width (500mm) of staircase = 60 persons. Hotel residential occupancy (Staircase S2 & S3) Number of persons per unit of exit width (500mm) of staircase = 30 persons.
What is BP approval?
Planning Permission (KM) approval is needed for the owner who seeks permission to carry out the new development. On the other hand, Building Plan (BP) approval is needed when the owner seeks to have the details of development checked and approved to comply with the standard rules and regulations of construction.
What is Ri inspection?
A RI is a person who is registered under the Fire Safety Act to be qualified and competent to inspect fire safety works in buildings to ascertain the degree of compliance of fire safety requirements.